Clear, owned outputs.
- Application and dependency inventory
- Migration strategy for each workload
- Wave plan and timeline
- Cutover runbooks with rollback steps
- Post-migration review and optimization plan
A good migration is mostly planning. We map applications and their dependencies, choose the right strategy for each workload — rehost, replatform, refactor, replace, retain or retire — group them into waves and rehearse cutovers, so the move happens with minimal disruption and a clear rollback plan.
Discovery, wave planning, rehearsed cutovers and post-migration optimization.
Dependencies between applications are poorly documented.
Downtime windows are short or non-existent.
A 'lift and shift' approach risks moving old problems into the cloud.
Teams fear migration because of past outages.
Inventory of servers, applications, data and dependencies.
The six Rs applied workload by workload.
Grouping and sequencing workloads to manage risk.
Database and file migration with validation.
Practice runs, runbooks and rollback plans.
Right-sizing, modernization and decommissioning.
Each application gets its own strategy. Moving everything the same way is how migrations run over budget.
| Strategy | What it means | Fits when |
|---|---|---|
| Rehost | Lift and shift to cloud VMs with minimal change. | Deadlines are tight, such as a data-centre exit. |
| Replatform | Small changes to use managed services — a managed database, for example. | Quick wins on operations without a rewrite. |
| Refactor | Re-architect to containers or serverless. | The application is strategic and limits the business today. |
| Repurchase | Replace with a SaaS product. | A commodity system like email or HR is being self-hosted. |
| Retain | Leave it where it is for now. | Dependencies or licensing make moving it costly. |
| Retire | Switch it off. | Usage is low and the function exists elsewhere. |
Rehearsed cutovers and rollback plans protect operations.
Each workload gets the approach it deserves.
Old infrastructure is decommissioned on schedule.
Current state, risks, constraints and goals reviewed with your team.
Target state, options and trade-offs written down and agreed.
Changes delivered as code, peer-reviewed and tested.
Changes rolled out safely with monitoring and rollback ready.
Documentation, runbooks and knowledge transfer to your team.
It depends on the number and complexity of workloads. Small estates can move in weeks; larger ones run in waves over months. The wave plan sets a realistic timeline.
Usually some, but it can often be reduced to a short planned window through replication and rehearsal. We agree acceptable downtime per application.
Sometimes. Modernizing everything at once adds risk; moving first and modernizing high-value workloads later is often safer. We decide per workload.